WASTE TO ENERGY
EN

Design & Engineering

We design and manufacture advanced overhead cranes — single-girder or double-girder — equipped with clamshell or orange-peel grabs.
Every project is engineered for precision handling of bulk materials, solid waste, and organic residues, ensuring maximum performance and durability.


Automation & Control

Our systems integrate smart PLC control with the plant’s DCS network, enabling real-time diagnostics and seamless automation.
Operation can be manual, semi-automatic, or fully automatic, offering full flexibility and process optimization.


Integration & Efficiency

Designed for waste-to-energy, composting, and anaerobic digestion plants, Meloni cranes guarantee continuous operation, energy efficiency, and safe working environments even under heavy-duty conditions.


 

Turn-Key Solutions Worldwide

From concept to commissioning, Meloni Tecno-Handling provides turn-key handling systems tailored to each client’s operational needs.
Our team manages design, assembly, testing, and after-sales support, delivering reliability and performance across Italy and international markets.


Italian Engineering, Global Vision

With decades of experience in industrial automation and material handling, Meloni Tecno-Handling combines engineering excellence with a forward-looking approach.
Because moving materials also means moving innovation forward.


 

Guglionesi Waste Treatment Plant

Location: Italy • (CB) • Guglionesi 

Project: Waste Treatment Plant
Year: 2019

718612

Machine: single girder bridge crane with electrohydraulic bucket for organic waste handling
SWL: 5 t
Span: 33 m
Technical Peculiarities: full automatic operation

Baiona Disidrat Sludge Treatment Plant

Location: Italy • (RA) • Baiona  

Project: Disidrat Sludge Treatment Plant
Year: 2010

710060

Machine: N.3 double girder bridge cranes with electrohydraulic bucket for sludge handling

SWL: 6,3 t
Span: 17,1 / 21,5 m
Technical Peculiarities: manual operation by remote control, with plc for diagnostic
Handled Materials: oily sludge - sludge d15 - inorganic sludge

Foligno Anaerobic Digestion Plant

Location: Italy • (PG) • Foligno 
Project: Anaerobic Digestion Plant
Year: 2017

717396

Machine: single-girder bridge crane with electrohydraulic grab for organic waste handling
SWL: 3,2 t
Span: 18,6 m
Technical Peculiarities: full automatic operation - 13 t / h handling capacity

Hogbytorp Biogas Plant

Location: Sweden • Bro • Hogbytorp 
Project: Biogas Plant
Year: 2018

718068

Machine: single girder bridge crane with electrohydraulic grab for organic waste handling
SWL: 5 t
Span: 16,1 m
Technical Peculiarities: full automatic operation

Monterotondo Marittimo Composting Plant

Location: Italy • (GR) • Monterotondo Marittimo 
Project: Composting Plant
Year: 2018

718324

Machine: biomass crane - double girder bridge crane with electrohydraulic bucket for biomass mixing and handling
SWL: 9 t
Span: 15,34 m
Technical Peculiarities: full automatic operation

Handled Materials: organic waste - wood - dewatered waste - sludge

Escondido Anaerobic Digestion Plant

Location: USA • California • Escondido 
Project: Anaerobic Digestion Plant
Year: 2019

719511

Machine: double girder bridge crane with electrohydraulic grab for organic waste handling
SWL: 4 t
Span: 23,7 m
Technical Peculiarities: full automatic operation

SLOUGH EFW

Location: UK • Bedfordshire County • Stewartby 
Project: Energy from Waste Plant built by KVI
Year: 2024

721230

Machine: n. 2 double girder bridge cranes with electrohydraulic grab for waste handling and auxiliary hoist for “fishing grab”
SWL:  24/12,5 t

Span: 29 m
Technical Peculiarities: full-automatic operation of the whole cranes system, with complete bunker management

SLOUGH EFW

Location: UK • Bedfordshire County • Stewartby
Project: Energy from Waste Plant built by KVI
Year: 2024

721230

Machine: double girder bridge crane with electrohydraulic bucket for bottom ash handling
SWL: 8 t
Span: 8,8 m
Technical Peculiarities: crane driven by operator from control chair in wall mounted cabin

ROOKERY EFW

Location: UK • Bedfordshire County • Stewartby 
Project: Energy from Waste Facility built by KVI
Year: 2022

719269

Machine: n. 2 double girder bridge cranes with electrohydraulic grab for waste handling and auxiliary hoist for “fishing grab”
SWL: 24/12,5 t
Span: 24,95 m
Technical Peculiarities: full-automatic operation of the whole cranes system, with complete bunker management